Sectors
Case study
Expansion of the heating system in the GEOTHERMAL HEATING PLANT in Szaflary-Bańska Niżna
The scope of works of the completed stage of the Investment included:
Execution of a closed shell building for the designed compressor installation of the heat pump/pumps – R1/R2 building, complete design and construction, and partial equipment with electro-energetic devices of the electrical switching station and transformers building – R3 building, replacement of eNN cables from the ESN 15kV switching station in the R3 building to the eNN 0.4kV switching station in the GEOTHERMAL HEATING PLANT building, design and construction of a TEMPORARY TRAFO STATION along with switching and electrical connections to ensure the continuity of power supply to the facilities connected from the existing TRAFO STATION No. 5382 „GEOTERMIA PODHALAŃSKA”.
Expansion of the heating system in the GEOTHERMAL HEATING PLANT in Szaflary-Bańska Niżna
power engineering
Completed projects
GAMAWIND SP. Z O.O.
Execution of the power supply system for the facility, cogeneration units as well as the production and recovery of heat energy for the newly built CHP plant as part of the „Distillery integrated with biogas plant” project.
CHP PLANT
Execution of air-conditioning installation in switchgear rooms in the CHP plant.
GAMAWIND SP. Z O.O.
Execution of the power supply system for the facility, cogeneration units as well as the production and recovery of heat energy for the newly built CHP plant as part of the „Distillery integrated with biogas plant” project.
WIELICZKA SALT MINE S.A.
Reconstruction of the air-conditioning and ventilation system at the Daniłowicz shaft along with the modernization of the electricity supply station in the Wieliczka Salt Mine S.A.