Menu

pl

Reference projects

Case study

Reconstruction of air conditioning system (cooling, heating, dehumidification) in Daniłowicz tourist shaft, including modernization of the electric power station and control/SCADA system.

The aim of the contract was to provide de-humidification of air from ventilation for the Daniłowicz tourist shaft during periods of high temperatures and high humidity and also to provide heating during the winter.

Wieliczka Salt Mine SA

OIL & GAS

Case study

Ensure continuous and self-sufficient production and supply of electricity and thermal energy for agricultural distillery.

The goal of the order was to ensure continuous supply of electricity and thermal energy in the form of steam and hot water for agricultural distillery using biogas powered generation equipment, which is a byproduct of processes of the distillery.

Integrated Distillery-Biogas power plant

INDUSTRY

Case study

Performance of project documentation for investors from the biogas industry.

The subject of the tasks carried out for investors from the biogas industry, was the performance of project documentation, manufacture and supply of 12 complete CHP units with biogas-engines E3262 LE212 manufactured by MAN , each unit parameters Pe = 499.5 kW , Pc = 541.0 kW. Housing containers were made for cogeneration units.

CHP for agricultural biogas plants

ENVIRONMENT

Case study

Expansion and reconstruction of the sludge part of the Sewage Treatment Plant in Tarnów

Expansion and reconstruction of the facilities of the sludge part in the Wastewater Treatment Plant in Tarnów in the scope of delivery, assembly and start-up of a gas boiler house with a capacity of 2 x 500kW and the design, delivery, assembly and start-up of two combined energy cogenerators with an electric power of 2 x 500 kW and a total thermal power of 2 x 567 kW

Sewage Treatment Plant in Tarnów

environment

Case study

Expansion of the heating system in the GEOTHERMAL HEATING PLANT in Szaflary-Bańska Niżna.

The scope of works of the completed stage of the Investment included:

Execution of a closed shell building for the designed compressor installation of the heat pump/pumps – R1/R2 building, complete design and construction, and partial equipment with electro-energetic devices of the electrical switching station and transformers building – R3 building, replacement of eNN cables from the ESN 15kV switching station in the R3 building to the eNN 0.4kV switching station in the GEOTHERMAL HEATING PLANT building, design and construction of a TEMPORARY TRAFO STATION along with switching and electrical connections to ensure the continuity of power supply to the facilities connected from the existing TRAFO STATION No. 5382 „GEOTERMIA PODHALAŃSKA”.

Expansion of the heating system in the GEOTHERMAL HEATING PLANT in Szaflary-Bańska Niżna

POWER ENGINEERING

Case study

Installation of injection pumps and installation of two additional filters at the Geothermal Pumping Station in Biały Dunajec

The scope of work included: design work in the field of architecture, construction, technology, electricity and I&C, together with a strength analysis for pipelines, installation of injection pumps and installation of two additional filters at the Geothermal Pumping Station in Biały Dunajec.

Installation of injection pumps and installation of two additional filters at the Geothermal Pumping Station in Biały Dunajec

POWER ENGINEERING

Case study

Comprehensive execution of construction works for brine graduation towers with the following parameters:

Southern graduation tower: length 54.0 m, width of the structure 4.2 m, height of the structure 7.0 m

Northern graduation tower: length 33.0 m, width of the structure 4.2 m, height of the structure 7.0 m

Execution of construction works for brine graduation towers

environment

Case study

Construction of a geothermal heating plant in Toruń, using the existing TG-1 and TG-2 wells
al Protection

Construction of a geothermal heating plant in Toruń, using the existing TG-1 and TG-2 wells, based on two UT-M 50 gas boilers with instrumentation and a system of economizers with a nominal power of 10.00 MW, one UT-M 8 gas boiler with instrumentation and a system of economizers with a nominal power of 1.20 MW and two high-efficiency bromolite absorption heat pumps with a nominal power of 8.00 and 6.00 MW.

Construction of a geothermal heating plant in Toruń, using the existing TG-1 and TG-2 wells

power engineering

Case study

The subject of the order is the execution of the scope of works related to the Construction of the Geothermal Heating Plant along with the infrastructure in Konin, including the execution of the GT-3 geothermal well:

Construction of the Heating Plant building, which will contain devices used to receive heat energy from geothermal water. The building will be adapted to internal modular construction. An electrical switching station module with a heat control room and a technological hall with heat exchangers, a filter station with a supporting geothermal water injection pump and network water pumps will be built.

Construction of a sealed auxiliary tank with a capacity of approximately 2,000 m3 near the Heating Plant.

Drilling of the Konin GT-3 well with a pipeline connecting it with the Geothermal Heating Plant.

Installations of devices used to receive heat energy from a geothermal borehole,

Construction of a heating connection from the planned Geothermal Heating Plant to the existing heating main.

Construction of electrical switching stations and heat control room

Construction of the Geothermal Heating Plant in Konin in the scope of: Task I - Construction of the Geothermal Heating Plant with infrastructure Task II - Execution of the Konin GT-3 geothermal well

power engineering

Case study

The subject of the investment are the following tasks:

– task no. 1 „Construction of a geothermal and biomass heating plant in Sieradz together with the GT-2 injection well” – in the „design and build” formula.

– task no. 2 „Construction of a 0.9 MWe and 1.1 MWt cogeneration module supporting the operation of the geothermal and biomass heating plant in Sieradz” – in the „design and build” formula.

Construction of a geothermal and biomass heating plant with the GT-2 injection well. Construction of a cogeneration module with a capacity of 0.9 MWe and 1.1 MWt supporting the operation of a geothermal and biomass heating plant

power engineering

Case study

The new gas-oil boiler house will have a capacity of 45 MWt and will be equipped with two water boilers with a capacity of 20 MWt each and one water boiler with a capacity of 5MWt.

Construction of a gas-oil boiler house with installations and auxiliary systems as well as connections to the infrastructure of the plant in EC Pruszków

power engineering

environment

Gamawind Sp. z o.o.

Execution of the power supply system for the facility, cogeneration units as well as the production and recovery of heat energy for the newly built CHP plant as part of the „Distillery integrated with biogas plant” project.

environment

Wind power plant
Karor Sp. z o.o.

Construction work related to the connection to the power grid of the „Glińsk 6MW” Wind Farm consisting of three 2MW wind turbines for Elektrownie Wiatrowe Karor Sp. z o. o.

environment

District Hospital in Mielec

The concept of modernization of the heating and electrical infrastructure in the District Hospital in Mielec in terms of reducing current energy costs.

indusry

CHP plant

Execution of air-conditioning installation in switchgear rooms in the CHP plant.

industry

Facility in Skawina

Inspection of the chiller located in Skawina.

industry

Facility in Skawina

Dostawa, montaż i wdrożenie agregatu wody lodowej zlokalizowanego w Skawinie.

industry

IZO-BLOK in Chorzów

Execution of projects for the technological sector and an electric steam boiler house 8.3 t/h, 10 bar and a 400kW cogeneration unit in Chorzów.

industry

Elektromontaż Rzeszów S.A.

Preparation of design documentation and installation works for a transport system for collecting poles from roller conveyors for Elektromontaż Rzeszów SA.

industry

Elektromontaż Rzeszów S.A. – Building Complex in Mielec

Modernization of the control and visualization system of the longitudinal milling machine IMA on the postforming line for Kronospan Mielec Sp. z o. o.

industry

Facility in Skawina

A comprehensive review of MV and LV equipment for a plant located in Skawina.

industry

Elektromontaż Rzeszów S.A.

Modernization of the safety system of a laser welding and cutting machine for Elektromontaż Rzeszów SA.

industry

Elektromontaż Rzeszów S.A.

Delivery, assembly and commissioning of an integrated system for laser welding of lighting columns for Elektromontaż Rzeszów S.A.

industry

Factory of Prestressed Concrete Sleepers in Bogumiłowice

Execution of the concept, design documentation and installation works for the construction of heating and humidification of scalding tunnels in the production hall at Wytwórnia Podkładów Prestressed concrete in Bogumiłowice.

industry

Production plant in Mielec

Delivery and assembly of the main low-voltage switchgear for the new WTC boiler house.

industry

Elektromontaż Rzeszów S.A. – Building Complex in Mielec

Modernization of the installation for the production of panel flooring at the facility of Kronospan Mielec Sp. z o. o.

industry

Gamawind Sp. z o.o.

Execution of the power supply system for the facility, cogeneration units as well as the production and recovery of heat energy for the newly built CHP plant as part of the „Distillery integrated with biogas plant” project.

POWER ENGINEERING

Elektrownie Wiatrowe Karor Sp. z o.o.

Construction work related to the connection to the power grid of the „Glińsk 6MW” Wind Farm consisting of three 2MW wind turbines for Elektrownie Wiatrowe Karor Sp. z o. o.

POWER ENGINEERING

CHP plant

Execution of works related to the reconstruction of the cooling water system in the Heat and Power Plant.

POWER ENGINEERING

GAZ-SYSTEM S.A. Branch in Tarnów

Modernization of the switching station and power lines in the Jarosław Gas Compressor Station.

POWER ENGINEERING

GAZ-SYSTEM S.A. Branch in Tarnów

Inspection of electrical switchboards at gas compressor stations in TJE Jarosław for Gas Transmission Operator GAZ-SYSTEM SA Branch in Tarnów.

POWER ENGINEERING

Specialist Hospital in Jasło

Delivery, installation and commissioning of a power generator for the Specialist Hospital in Jasło – execution of a replacement power source for the Specialist Hospital in Jasło in the event of special hazards during natural disasters.

POWER ENGINEERING

Agricultural University of Hugo Kołłątaj in Krakow

Replacement of the low-voltage switchgear in the building of the Faculty of Forestry of the University of Agriculture. Hugo Kołłątaj in Krakow.

POWER ENGINEERING

Commercial facility in Gryfice

Implementation of low-voltage installations for the Commercial Facility in Gryfice.

POWER ENGINEERING

CHP plant

Prefabrication, delivery, assembly and start-up of a PLC cabinet for control and monitoring of the switchgear.

POWER ENGINEERING

CHP plant

Prefabrication, delivery, assembly and commissioning of the controller cabinet along with the visualization of switchgears

POWER ENGINEERING

IZO-BLOK in Chorzów

Execution of projects for the technological sector and an electric steam boiler house 8.3 t/h, 10 bar and a 400kW cogeneration unit.

POWER ENGINEERING

District Hospital in Mielec

The concept of modernization of the heating and electrical infrastructure in the District Hospital in Mielec in terms of reducing current energy costs.

POWER ENGINEERING

Fabryka Papieru i Tektury „BESKIDY” S.A. in Wadowice

Modernization of 15 kV fields in the substation in Zaskawa.

POWER ENGINEERING

Facility in Skawina

A comprehensive review of MV and LV equipment for a plant located in Skawina.

POWER ENGINEERING

Tauron Dystrybucja S.A. Branch in Tarnów

Development of design documentation for the task entitled Modernization of the LV network powered from the S467 Zawada station, direction of the farm and replacement of the station in msc. Zawada for Tauron Dystrybucja SA Branch in Tarnów.

POWER ENGINEERING

Tauron Dystrybucja S.A. Branch in Tarnów

Development of design documentation for the task entitled „Replacement of non-mains cables 6kV station S-440 Parkowa 1 – station S-700 Parkowa 4 in Dębica” for Tauron Dystrybucja SA Branch in Tarnów.

POWER ENGINEERING

Tauron Dystrybucja S.A. Branch in Tarnów

Development of design documentation for the task entitled; Modernization of the 15 kV Pilzno-WUCH line from pole No. 101 to Ł-1166 in the month of Słotowa for Tauron Dystrybucja SA Branch in Tarnów.

gas & oil

Wieliczka Salt Mine S.A.

Reconstruction of the air-conditioning and ventilation system at the Daniłowicz shaft along with the modernization of the electricity supply station in the Wieliczka Salt Mine S.A.

gas & oil

Elektrownie Wiatrowe Karor Sp. z o.o.

Construction work related to the connection to the power grid of the „Glińsk 6MW” Wind Farm consisting of three 2MW wind turbines for Elektrownie Wiatrowe Karor Sp. z o. o.

gas & oil

GAZ-SYSTEM S.A. Branch in Tarnów

Modernization of the switching station and power lines in the Jarosław Gas Compressor Station.

gas & oil

GAZ-SYSTEM S.A. Branch in Tarnów

Inspection of electrical switchboards at gas compressor stations in TJE Jarosław for Gas Transmission Operator GAZ-SYSTEM SA Branch in Tarnów.