Realization of investments in the EPC formula

Energy Solutions is an experienced and reliable business partner offering execution of complex investment projects in the „design and build” mode. Each project ensures the highest standards of service in the conceptual and the executive dimension.

Realization of investments in the EPC formula for industrial sector.

Energy Solutions is the implementer of the new industrial and general construction in the EPC formula. It provides professional investment services for the most demanding customers of the industrial sector.

Realization of investments in the EPC formula for environmental sector.

Energy Solutions will provide support to investors for innovative environmental projects across the country because all future investments are based primarily on technology, combining efficiency with renewable energy sources.

Realization of investments in the EPC formula for power engineering sector.

Our experience in optimizing the use of resources and a competent engineering team makes us a reliable choice to partner in effective mangement of all large investment projects in the energy sector. With the appropriate solutions, Energy Solutions can achieve energy savings from 30 to 70 percent.

Realization of investments in the EPC formula for mining sector.

Energy Solutions provides specialized contracting services for natural gas and crude oil for fuel industry. Highly competent and licensed team od engineers support to ensure the fulfillment of a number of requirements set by the specificities of the sector.

Competencies

Comprehensive experience and competencies of Energy Solutions, allow effective implementation of complex projects and provide professional service of projects in the EPC formula.

Energy Solutions is a proven company in investment services.

0 mln EUR

WORTH OF PROJECTS ON WHICH THE COMPANY AND ITS EMPLOYEES WORKED

0 km

LAID CABLES

0 MW

THE TOTAL VALUE OF ELECTRIC POWER OF INSTALLED SYSTEMS

0 MW

THE TOTAL VALUE OF THERMAL ENERGY OF INSTALLED SYSTEMS

Reference projects

Integrated Distillery-Biogas power plant

INDUSTRY

Integrated Distillery-Biogas power plant

INDUSTRY

Gorzelnia zintegrowana z biogazownią

Ensure continuous and self-sufficient production and supply of electricity and thermal energy for agricultural distillery.

The goal of the order was to ensure continuous supply of electricity and thermal energy in the form of steam and hot water for agricultural distillery using biogas powered generation equipment, which is a byproduct of processes of the distillery.

CHP for agricultural biogas plants

ENVIRONMENT

CHP for agricultural biogas plants

ENVIRONMENT

Aplikacje kogeneracyjne dla biogazowni rolniczych

Performance of project documentation for investors from the biogas industry.

The subject of the tasks carried out for investors from the biogas industry, was the performance of project documentation, manufacture and supply of 12 complete CHP units with biogas-engines E3262 LE212 manufactured by MAN , each unit parameters Pe = 499.5 kW , Pc = 541.0 kW. Housing containers were made for cogeneration units.

Wieliczka Salt Mine SA

OIL & GAS

Wieliczka Salt Mine SA

OIL & GAS

Kopalnia Soli w Wieliczce

Reconstruction of air conditioning system (cooling, heating, dehumidification) in Daniłowicz tourist shaft, including modernization of the electric power station and control/SCADA system.

The aim of the contract was to provide de-humidification of air from ventilation for the Daniłowicz tourist shaft during periods of high temperatures and high humidity and also to provide heating during the winter.

Integrated Distillery-Biogas power plant

INDUSTRY

Integrated Distillery-Biogas power plant

INDUSTRY

Gorzelnia zintegrowana z biogazownią

Ensure continuous and self-sufficient production and supply of electricity and thermal energy for agricultural distillery.

The goal of the order was to ensure continuous supply of electricity and thermal energy in the form of steam and hot water for agricultural distillery using biogas powered generation equipment, which is a byproduct of processes of the distillery.

CHP for agricultural biogas plants

ENVIRONMENT

CHP for agricultural biogas plants

ENVIRONMENT

Aplikacje kogeneracyjne dla biogazowni rolniczych

Performance of project documentation for investors from the biogas industry.

The subject of the tasks carried out for investors from the biogas industry, was the performance of project documentation, manufacture and supply of 12 complete CHP units with biogas-engines E3262 LE212 manufactured by MAN , each unit parameters Pe = 499.5 kW , Pc = 541.0 kW. Housing containers were made for cogeneration units.

Wieliczka Salt Mine SA

OIL & GAS

Wieliczka Salt Mine SA

OIL & GAS

Kopalnia Soli w Wieliczce

Reconstruction of air conditioning system (cooling, heating, dehumidification) in Daniłowicz tourist shaft, including modernization of the electric power station and control/SCADA system.

The aim of the contract was to provide de-humidification of air from ventilation for the Daniłowicz tourist shaft during periods of high temperatures and high humidity and also to provide heating during the winter.

Kopalnia soli w Wieliczce

Górnictwo

Kopalnia Soli w Wieliczce
Przebudowa instalacji klimatyzacji przy szybie Daniłowicz wraz z modernizacja stacji zasilania w energię elektryczną.
Celem realizacji zamówienia było zapewnienie osuszenia powietrza wentylacyjnego dla szybu Daniłowicz w okresie występowania wysokich temperatur i podwyższonej wilgotności powietrza oraz jego ogrzewanie w okresie zimowym.

Gorzelnia zintegrowana z biogazownią

przemysł

Gorzelnia zintegrowana z biogazownią

Zapewnienie ciągłego zasilania gorzelni rolniczej w energię elektryczną i energię cieplną.

Celem realizacji przedmiotu zamówienia było zapewnienie ciągłego zasilania gorzelni rolniczej w energię elektryczną i energię cieplną, w postaci pary technologicznej oraz gorącej wody, wykorzystując do zasilania urządzeń wytwórczych biogaz, będący produktem ubocznym procesów technologicznych gorzelni.

Aplikacje kogeneracyjne dla biogazowni rolniczych

OCHRONA ŚRODOWISKA

Aplikacje kogeneracyjne dla biogazowni rolniczych

Wykonanie dokumentacji projektowej dla inwestorów z branży biogazowej.

Przedmiotem zadania, realizowanego dla inwestorów z branży biogazowej, było wykonanie dokumentacji projektowej, produkcja oraz dostawa 12-stu kompletnych jednostek kogeneracyjnych napędzanych silnikami biogazowymi E3262 LE212 produkcji MAN, każda jednostka o parametrach
Pe = 499,5 kW, Pc = 541,0 kW. Jednostki kogeneracyjne wykonane zostały w zabudowie kontenerowej.

ENVIRONMENT

Gamawind Sp. z o.o.

Installation of the power facility, CHP units and the production and recovery of thermal energy for newly built power plant in the framework of the project „Integrated Distillery-Biogas power plant.”

INDUSTRY

Heat and Power Plant

Installation of air conditioning in the indoor switchgear of Heat and Power Plant.

POWER ENGINEERING

Gamawind Sp. z o.o.

Installation of the power facility, CHP units and the production and recovery of thermal energy for newly built power plant in the framework of the project ” Integrated Distillery-Biogas power plant.”

OIL & GAS

Wieliczka Salt Mine SA

Reconstruction of air conditioning system (cooling, heating, dehumidification) in Daniłowicz tourist shaft, including modernization of the electric power station and control/SCADA system.